A "Works within Municipal Road Reserves" permit must be obtained from Strathbogie Shire Council before any works can be undertaken within any Council managed road reserves. These are the majority of roads within the Strathbogie Shire Local Government Area.
This is to ensure that Council's road reserves are protected and reinstated to their original state after works have been carried out.
The Road Reserve is the public land located between private property / title boundaries and generally consists of a naturestrip / roadside, drains and roadway.
Council cannot issue a permit for any works which are to take place within a VicRoads arterial road reserve or freeway. Consent for these works must be obtained from VicRoads. More information regarding this is available from the VicRoads website here.
Typical works within a road reserve which require Council permit approval are:
Any vehicle crossing / crossover works must be constructed in accordance with the following IDM standard drawings:
Any house drain stormwater connection works must be constructed in accordance with the following IDM standard drawings:
Public liability insurance generally provides financial protection to both the public and also the responsible persons conducting works, in the event of an incident resulting in damages or injury to third party assets or persons.
A mimimum policy coverage of $10 million is required for persons / companies conducting works within the road reserve.
A public liability insurance certificate of currency must be provided to Council along with any permit application for works within a municipal road reserve.
You will also need to include a site plan showing the location and details of the proposed works. This plan must also show the location of all assets within the vicinity of the proposed works. These assets may include trees, landscaping, road pavement, kerb & channel, footpaths, drains, service authority assets or private assets.
A "Dial before you Dig" enquiry must be undertaken for any works which involve excavation. An online enquiry can be submitted on the Dial Before You Dig website here.
It is the applicant's responsibility to ensure that any proposed works will not conflict with or cause damage to any existing utility services.
The fees for a "Works within Road Reserve" permit are set with the Road Management Act and are indexed annually.
As at 1st July 2020, 1 fee unit = $14.81.
The fee for the consent of your works project will be determined from the fees schedule according to the extent of your works.
Please refer to the table below for guidance on what fee will be applicable:
Works, other than minor works | Minor Works | |||
On roadway, (see note 1) |
Not on roadway, (see note 2) |
On roadway, (see note 1) |
Not on roadway, (see note 2) |
|
Municipal roads, (see note 3) |
43.1 fee units ($638.30) |
23.5 fee units ($348.00) |
9.3 fee units ($137.700 |
6 fee units ($88.90) |
Municipal roads, (see note 3) |
23.5 fee units ($348.00) |
6 fee units ($88.90) |
9.3 fee units ($137.70) |
6 fee units $88.90) |
Notes:
1. Conducted on, or on any part of the roadway, shoulder or pathway
2. Not conducted on, or on any part of the roadway, shoulder or pathway
3. Municipal road or non-arterial State road
Contractor / works managers must undertake reinstatement of all affected infrastructure to Council standards and satisfaction.
If reinstatement work is not undertaken to Council satisfaction, Council may elect to reinstate or rectify any defects at the cost of the contractor / works manager.
All trenching backfill and surface reinstatement works must be in accordance with IDM standard drawing SD310.
If you are planning any works on a road, street, lane or footpath, you must submit a Traffic Management Plan (TMP) with your application for Council to review.
A Traffic Management Plan must be prepared by a qualified person as required by the Road Management Act 2004 and Road Safety Act 1986 and must be in accordance with Australian Standard AS 1742.3 2009.
This requirement is in accordance with the Road Management Act 2004 (A code of practice for worksite safety - traffic management), the Road Safety Act 1986 and Australian Standard AS 1742.3 2009 - Traffic control devices for works on roads.
The following items must be consideredand, if relevant to the specific project, be addressed on the TMP drawings:
Pedestrian access must be maintained at all times. Any detours or alternative pathways required for pedestrians must be designed to take into account accessibility issues for people for disabilities.